CIDB CFMM Certified

The engineering backbone
of your facility.

Hard FM covers every physical system keeping your building alive — MEP, HVAC, fire suppression, high-rise fabric. Access Grid manages all of it through OEM-based PPM, CMMS-tracked records, and 24/7 emergency response.

PPM
OEM-based schedules
24/7
Emergency response
CMMS
All records tracked
CFMM
Certified MD oversight
Hard Facilities Management

Physical systems that can't be allowed to fail.

Hard FM — also called Hard Services or Building Services — refers to all physical infrastructure and engineering systems within a building. These are typically fixed, regulated systems requiring certified maintenance and statutory inspections.

It forms the foundation of any Integrated FM programme. Without functioning physical systems, no facility can operate. Access Grid's Hard FM programme is built on OEM-based preventive maintenance, a criticality ranking approach that prioritises safety-critical systems, and a CMMS that tracks every work order.

OSHA 1994 DOSH BOMBA UBBL 1984 CIDB Act 520 OEM PPM CMMS Tracked
MEP Digital Twin • Criticality Filter
Displaying: All Integrated Building Engineering Systems
Priority 1 — Safety Critical
Fire Systems, Electrical Distribution, Emergency Lighting
Highest priority in all resource conflicts. Immediate dispatch.
Priority 2 — Business Critical
HVAC, Central Chillers, Plumbing, Generators, UPS
Direct operational impact. Guaranteed 2-hour SLA response.
Priority 3 — Comfort & Fabric
Facade Maintenance, Lifts, Escalators, Civil Works
Maintained to schedule. OEM preventive cycles.
Approach Benchmark
80% Planned Preventive : 20% Reactive Maintenance
Industry benchmark for an audited, low-risk FM programme.
MEP Systems
HVAC & Air-Con
High-Rise & Facade
What We Manage

Every building system. Maintained to standard.

Access Grid manages the full range of Hard FM systems — from daily checks and scheduled PPM to emergency response and statutory inspections. All works are documented, tracked in CMMS, and reported monthly to client management.

Mechanical, Electrical & Plumbing (MEP)

The core engineering systems of any building. Access Grid manages HV/LV electrical distribution, DB panel maintenance, generator and UPS testing, plumbing systems, water supply and drainage — through scheduled PPM and 24/7 emergency response. All electrical works by certified wiremen and chargeman where required.

Air-Conditioning & HVAC

Full ACMV maintenance across all system types — split units, centralised chillers, AHUs, FCUs, cooling towers, and VRF/VRV systems. OEM-based PPM schedules, refrigerant management, water treatment for cooling towers, and energy optimisation through setpoint control and scheduling.

Fire Fighting & Detection Systems

Complete fire system maintenance — sprinkler systems, fire alarm panels, hose reels, fire hydrants, emergency lighting, smoke detectors, and suppression systems. BOMBA-compliant servicing with annual certification, quarterly testing, and 24/7 fault response.

High Rise & Facade Maintenance

Specialist maintenance for buildings at height — facade cleaning, structural inspection, rope access works, waterproofing, sealant replacement, and building fabric repairs. All high-rise works by DOSH-certified rope access personnel with full HIRARC documentation and PTW.

Civil & Building Works

Minor civil and building fabric maintenance — roof inspections and repairs, wall and ceiling repairs, tile replacement, floor maintenance, door and hardware servicing, roller shutter maintenance, and loading dock equipment. Keeping the building fabric in good condition protects asset value.

Lifts, Escalators & Specialist Systems

Coordination and oversight of lift and escalator maintenance contracts — ensuring statutory inspections are completed, DOE and JKKP compliance is maintained, and breakdown response meets SLA. Access Grid manages the contractor relationship so you don't have to chase your lift maintenance vendor.

Maintenance Programme

Five maintenance types. One integrated programme.

Access Grid's Hard FM programme uses all five maintenance types — targeting 80% planned vs 20% reactive — to minimise breakdowns, extend asset life, and reduce total maintenance cost.

01

Condition-Based Servicing

Using vibration analysis, thermal imaging, and performance trend data to identify deteriorating assets before they fail — servicing when needed, not just on schedule.

02

OEM-Based PPM

Fixed preventive maintenance schedules based on manufacturer recommendations — monthly, quarterly, bi-annual, and annual service cycles tracked through CMMS.

03

Defect Resolution

Prompt repair of identified defects — logged in CMMS, assigned to the right technician, completed within agreed SLA response time, and closed with photographic evidence.

04

24/7 Critical Response

Immediate response to critical system failures — direct MD contact, standby contractor network, and escalation protocols ensuring the fastest possible restoration.

05

Lifecycle-Planned Replacement

End-of-life asset replacement planned from our asset register and lifecycle data — avoiding emergency capital spend and allowing proper CAPEX budgeting.

The 80:20 Standard

Access Grid targets 80% planned vs 20% reactive maintenance across all Hard FM systems — the industry benchmark for a well-managed FM programme. We track and report this ratio monthly to every client.

Common Questions

Hard FM explained.

Everything you need to know about our facilities management services.

Hard FM refers to all physical building systems — MEP, HVAC, fire systems, lifts, and building fabric. These are engineering systems requiring certified technical maintenance and statutory inspections. Soft FM refers to people-focused support services — cleaning, landscaping, pest control, waste management, and security. Both are components of Integrated Facilities Management (IFM). Access Grid delivers both Hard FM and Soft FM under one integrated programme.
We use a criticality ranking approach — safety-critical systems such as fire suppression, electrical distribution, and emergency lighting are always given top priority. Business-critical systems that directly affect operations come next. Comfort systems are managed to schedule but deprioritised in a resource conflict. This approach is documented in our maintenance strategy and reviewed annually with clients.
Yes. Electrical works are performed by certified wiremen and chargeman holding valid ST (Sijil Teknologi) or similar certifications where required under the Electricity Supply Act. Fire system works are performed by BOMBA-registered contractors. High-rise and rope access works by DOSH-certified personnel. All contractor certifications are verified before deployment and maintained in our compliance register.
All Hard FM maintenance records — PPM completion, work orders, inspection reports, statutory test results, contractor certifications, and HIRARC documents — are maintained in our CMMS. Monthly reports are provided to client management. Annual compliance summaries are prepared for DOSH, BOMBA, and other regulatory inspections. Records are retained for a minimum of 7 years.

Ready to put your Hard FM in certified hands?

Contact our CFMM-certified MD for a Hard FM assessment. We will review your current systems, identify maintenance gaps, and propose a programme built around your facility's specific engineering requirements.